what is the difference between TOR & TMT
Answer Posted / nknehru
1.TOR bars are coming under HYSD category and TOR is a brand name - Toristeg Steel Corporation of Luxembourg. TOR usually refers to cold treated bars.
2.TMT bars or Thermo Mechanically Treated bars are coming under HYSD category bars and manufactured by rolling steel wires and then passing them through water. TMT bars have a tough external layer and a soft core inside, which makes TMT bars corrosion –resistant and also increases their weldability.TMT refers to hot treated bars.
3.Round plain steel bars dominated the construction industry till seventies. Thereafter CTD (or TOR Steel) dominated the industry till nineties. Nowadays TMT or hot treated bars are the most popular due to its advantages over CTD (TOR) such as high strength and corrosion resistance
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
How to calculate steel for beam slab and column
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
why top layer of block work shoud be full size if any cut block adjustable than another layer?
what r you reqired for concrete baching plant?
what are the five benefits of using standard terminology in the measurement process?
what is the function of GSB all class ?
what is tension footing?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what are the ffactors you considered choosing the course?
Under what circumstances should pot bearings be used instead of elastomeric bearings?
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
What will you do if you encounter problems like accidents?
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)