how must steel will use for 1 cubic meter.formula of steel
for beam,column,lantern.
Answer Posted / utpal panchal
Required steel in concrete is Depend on Types on concreting different structure
For Example,
R.c.c Slab = 0.5 to 1 % steel Required in volume of concrete
R.c.c Beam = 1.8 to 2% % steel Required in volume of concrete
R.c.c column = 2.5 % % steel Required in volume of concrete
R.c.c Road = 0.6 % % steel Required in volume of concrete
(1) Here take Column 1 m3 concrete volume calculation is
(2.5 x 1/100) x 7850 =196.25 kg steel Required
(2) Here take Column 6.90 m3 concrete volume calculation is
( 2.5 x 6.90 /100) x 7850 =1354.12 kg steel Required
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
how many types of survey and what are levelling instrument?
what are the proper pipes for salt water line
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
In earth work 1300 cum soil how to calculate how many liters require in water
I need old MMUP exam question and answer for Civil engineering
Gidc technical que paper
residential buildings,mixing of concrete,structural,construction material,site handling.
What is the difference between absorption & adsorption and sorption?
what is called the inverd level of mabhole chamber?
How you can turn off the display for dimension in CAD?
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
how to identify np3 pipe and np4 pipe
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
For a washout valve why are two gate valves required in normal practice?