How to calculate the Airconditioner capacity for a standard
telecom BTS shelter?
Answer Posted / gajanan bharad
I am too seeking right answer, but I know that the calculations above are incorrect. We have to consider the heat generated by BTSs and not the power consumed by BTSs. We have to take into account the heat generated/ rate of heat generation in Watts by all the equipment inside the shelter. There are 48V SMPS, Battery sets, BTSs, Microwave equipment, lights and assume 2 persons working. Heat generated by the SMPS equals input power minus the output power (i.e. loss of energy in terms of heat). But for rest items need the information on heat generated. Then only we can arrive at correct air conditioner capacity requirement.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
hi I have done 3 yrs diploma in electrical engg after 10+2. I have 16 years of work experience into design proposals sales and engg application development in LV/MV swithcgear and sub station automation field. I want to apply for immigration to new zealand but I am not sure whether I qualify or not since I dont have a degree. Can anyone advice? Thanks Riz
i will applied in 1U-1W on 440 volt primary delta side. what is the result of magtic balance test
An active element is one which a. Supplies energy b. Absorbs energy c. Supplies energy and convert energy from one form to another
Why can't we parallel Voltage transformer secondary circuits?
I HAVE A INCOMING 100A MCCB TPN 25KA, CABLE LENGHT OF 80M 70MM CABLE SIZE FROM MAIN SUBBOARD TO NEW DB.BASE ON THE FAULT LEVEL SETTING OF 45KA.I WOULD LIKE TO FIND OUT 25KA ENOUGH KA. APPRECIATE IF SOMEBODY CAN ASSIST ME WITH FORMULA FOR THIS. FRM: JEFF
if a number of plc s are there then how many modbus to be used
Whether should be the oil level in OCTC transfomer? It should be upto winding immersed completely or should be upto tap changer s/w? How it will affect the performance of the transformer. Rating may be 33KVA
300m long and 30kw inductive loade 3phase supply how many size cable required
dg started in plc mode and load taken later one battery terminal connection will be disconnected by loose connection what will happen for dg and shall we connect battery terminals while dg in load time?
what is positive , negative & zero equivalent system resistance
How wire size can define in electrical wiring? What is the ratio?
How to identify the start and end of 3phase 12 lead motor if U1, U2, etc numberings are lost or erased.
what is the soft starter principle? how is connection diagram? what is the procedure for checking the connection?
Pls tell me whether we can use EN3A material for shafts of Permanent magnet alternator.What will be the effect of magnetic and nonmagnetic material for shafts on magnetic properties of PM rotor .
What are high pass filter and low pass filter? and What are the flowmeter ?