Can it be configured in such a way that the external
requisitions can also be taken into account while MRP runs
in consumption-based planning if VB is selected as MRP type?

Answer Posted / raghu

Use MRP type - V1 Manual reord.point w. ext.reqs

In OMDQ you can check which external requisitions are considered for this MRP type, you can customize a new one for your specific need.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How do you check quota rating?

641


Which documents are used as references when we create po?

660


What setting are required to run quota arrangement to determine vendor?

649


What do you mean by reservation?

594


What settings required to create purchase order automatically from a pr?

677






Difference between planned delivery time and gr processing time?

824


What is the interaction between sap mm and sap abap consultant and how does they interact?

639


What is the source of error "not allowed" in case of custom movement type creation?

709


What are the possible values of procurement type in material master?

720


How is the vendor return processed without a purchase order reference?

643


How to create pr or po by mrp?

647


What is the sequence of determining the vendor : quota arrangement, source list, pir, old po. Arrange them in right sequence.

1037


Explain release strategy

739


What is sales order stock?

684


What is goods receipt & goods issue?

657