What is MPS and difference between MRP and MPS?

Answer Posted / pradip chaudhari

MPS means master production scheduling which is used for high cost level material having high value and MRP is used for comparatively low cost level material

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Can anybody explain to me why the work scheduling view is required for semi-finished and finished products?

572


What is routing in sap pp?

778


What are the questions we need while we go company for analysis to implementation SAP? What we need to know generally? How can we define we need abab for improvement?

1436


Explain how can you create production order without routing and bom?

607


What is 'mps' (master production scheduling)?

706






Integration between PP and SD module.

989


What is the SPRO Path for requirement class and req. type?

3561


You want to insert an inspection check point at the end of an operation. How would you do that?

632


What is MTS and MTO and the difference between them?

1937


What is MRP Area or How can I excluede one storage location stock from MRP?

1332


Explain service level agreements

592


What is Auto GR?

1205


Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?

603


What is purpose of schedule margin key?

681


Mention what are the types of master views for production and planning?

589