Answer Posted / pradip chaudhari
MPS means master production scheduling which is used for high cost level material having high value and MRP is used for comparatively low cost level material
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Can anybody explain to me why the work scheduling view is required for semi-finished and finished products?
What is routing in sap pp?
What are the questions we need while we go company for analysis to implementation SAP? What we need to know generally? How can we define we need abab for improvement?
Explain how can you create production order without routing and bom?
What is 'mps' (master production scheduling)?
Integration between PP and SD module.
What is the SPRO Path for requirement class and req. type?
You want to insert an inspection check point at the end of an operation. How would you do that?
What is MTS and MTO and the difference between them?
What is MRP Area or How can I excluede one storage location stock from MRP?
Explain service level agreements
What is Auto GR?
Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?
What is purpose of schedule margin key?
Mention what are the types of master views for production and planning?