I am working in a process industry, in that there are
several sections devided in the SCADA screens and
individual sections may START independently. But sometimes
i am facing problem i.e, if section 2 Stopped by the
operator immediately Section 1 or Section 3 or Section 4 is
getting stopped can you expain the reason behind this?
Answer Posted / jitendra chauhan
following problem may:
1. Is same interlock may used other sections?
2. have you checked stop command DO of all section, may that same DO?
3. may network getting stop, may PLC going to stop while given to stop command?
4. may that same stop command linked on SCADA?
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
I have energy meter for educational project having 0.5s class but my friend need 0.2s class meter , which one is good for that purpose and what is the actual difference of that two classes , need very easy example also.??
What are different types of orifice plates? State their uses.
can you send remote seal interface level transmitter calculation steps for oil water saperator.
what is difference between HOT permit and cold permit
what is function of switch, and how is it work, explain with difination
How to work temperature gauge?
Why even multiple power supplu r used in instrumentation system?
What are the charcterstics of a P&ID controller block for Governor speed raise or lower for a load sharing functionality between 4 Gas turbines in droop mode.
Square root calculation for dp flow transmitter?
what is interface level measurement.who can calibrate interface level measurement transmitter online
Capacitance, resistance ( colour coding ), parallel & series circuits.
Describe the typical instrumentation used in monitoring the performance of a shell and tube heat exchanger.
how to connect transmitter measuring sulfur process? 1-by using long impulse line or 2- by using coated short impulse line
Operational amplifiers
What is the use of double seated valve?