Method of findingthe dry ingredient quantity of 1 m3
concrete.
Answer Posted / imran ali
1.54 is right
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
types of survey and levelling instrument ?
how to calculate load bearing column
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
How do You Maintain a structure after getting cube test of low strength.
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
What are the different types of runners?
How to take labor charges for construction of 1cum of concrete?
How long does it take concrete to harden?
How to calculate steel for beam slab and column
what is the anchorage length of reinforcement.
what is the design procedure for building
how to calculate the steel in 500yard
What is the difference between routing maintenance and major maintenance in school facilities?