Answer Posted / sai
a bom is said to be a recursive when the header material of the BOM is also used as a component in the manf. process. For example in the preparation of curd (header material) a small amount of curd (component) is used .
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the use of mrp list?
How mrp (material requirement planning) types are classified?
What is the production process in sap?
Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?
What is mrp group and what is the use of it?
Can’t one material be assigned to more than one operation in a routine?
What is the internal recruitment?
In project the customization is comes under which phase?
What do you mean by pooled capacity?
• How are basic order dates determined?
What is meant by slab?
Tell some standard order types and what configure done for current project
When you run MRP, What steps it Perform in Back ground or How do you schedule BG job for MRP
Control keys
What do you do to run MRP for just one MRP Controller?