I just created a company,completed all basic details i.e.,
creation of company, co.code, coa, stv, ppv, tol, a/c
groups then opened F-02 to post one posting BUT it's
showing an Error as Message No.: FF703 " Company code not
assigned to country or country to calculation procedure"
and unable to proceed further. The Msg: Company code not
assigned to country or country to calculation procedure
Message no. FF703
Diagnosis
An error occurred when checking the tax code. Either the
assignment of company code and country or of country and
calculation procedure is not correct.
Procedure
Check the system settings.
To do this, choose Maintain entries (F5).
If the program error occurred
In a standard SAP program, then create an OSS message
In a program you wrote yourself, then correct the program.
Please help me out.How to tackle this situation.Thanks
Answer Posted / nagesh
Hi NAGESH
once check the Global Parameters
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Am a Sap Fi trainee learning the process, i came across a topic Foreign currency valuation. my doubt is whether foreign currency valuation and foreign currency revaluation is one and the same?
What do you mean by value field groups? : co-pa
How do you configure electronic bank statement?
Can posting period variant be assigned to more than 1 company code?
What is an asset master? : fi- asset accounting
Can anyone please provide me atleast two Support Tickets of SAP FICO?
Explain posting of costs to cost centers? : co- cost center accounting
Describe mass change/how do you achieve this? : fi- asset accounting
Is it possible to change an existing b/s gl a/c to the p&l type? : fi- general ledger
Where are payment terms for vendor master maintained?
What are substitutions and validations?
Is there an easy way to maintain exchange rates in sap?
What is a sort version? : fi- asset accounting
1. What is Spec? 2. If you run AP program without giving next payment rundate then system what erros throughs? 3. How do you calculate depreciation in SAP? 4. What depreciation Terms? 5. Where so you assign the plant?
What all steps are involved in creating planning groups and planning levels in cash management? What changes does it bring?