How to calculate the lighting load & power load requirement
by knowing area of building/room. Is there any thumb rule?
Answer Posted / rm
You can calculate based on lighting load density factor.. which depends on the type of occupancy.... let's say 15w/m2 500m2 Then calculate 500x15 = 7500w.each lighting point will b assumed to have 100w/unit. So 7500/100= 75 lighting points
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
can any one suggest paper presentation topies for electrical engg?
(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)
Why Ac Systems Are Preferred Over Dc Systems?
What will be the fault current of any system when its generation is 10% of BASE generation( FUll Load )?Will is 10% or the same as full base calculation?
What is the RME and explain the full form and what is the RME work?
Explain about p.t?
I meggared my 2c*70 sq mm AL AR XLPE cable. its one end show 50 M ohm . is my cable is safe for laying. I have only one phase and neutral.
What is mean by spike arrester(Voltage Operated)
If we need4× 50mm sq cable but it's not available so we can pull 4×25mm sq 2cables
Where voltage are high and current to be interrupted is low the breaker preferred is:
how power trnafor from 1 point to another point in bus bar ya transmission line( voltage trnasfer from 1 point to another poin)
How can calculate the rating of a servo stabilizer for given a specific load
What happens if the Capacitive Voltage Transformer Primary neutral is not earthed. There is a CVT between Transformer and source, and the CVT neutral of the transformer is not earthed, does it effect the transformer while charging or does it effect the transformer charging process.
in general it is observed in power stations, the tertiary winding is used in higher rating Y-Y auto transformer but not in Y-Y power transformer. is the tertiary winding is compulsory then why it is not using in power transformer
how can i use REF and diffrencial relay both in 1 CT core for transformer protection?