Hi All. IN AR once the first dunning is sent to the client,
after that how the system will know the next dunning need to
be sent?
Answer Posted / naveen kumar
In AR the First Dunning letter is sent to the Customer,at that time Customer Master updating last Dunned dated Updated.While run the Dunning in F150 we are maintaining the Next Payment run Date based on that system will pick..
Thanks& Regards
Naveen Kumar
FI Consultant
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the main control parameter for settlement?
What is asset accounting (fi-aa)? : fi- asset accounting
What is internal and external number ranges? Discuss how they differ in their use?
Please what do you think i have done wrong when i receive a'No form could be determined in the interest calculation form table for the following arguments' after executing in F.26(Customer Interest Scale) calculating interest.
In a company there are 2 plants, Both Plants manufacturing the same product. In Plant 1 variance come. Now the client requirement is add that variance in the plant 2. How can we do that ?
How account payable in fi is related to g/l?
diff types of fi and co quations pls tell me
What is the meaning of preliminary cost estimate for product cost collector?
What is a line item? : fi- general ledger accounting
1. how can see that how much the vendor is owed 2.how do u reverse a MIRO invoice 3. how do u pay vendor in foreign currency
when i post a billing document for free goods how can i exclude for a line item (cost element type 1),not to create a profitability segment but only a cost center thanks in advance
What is stored in table t001 ?
Is it possible to change an existing b/s gl a/c to the p&l type? : fi- general ledger
What is a credit memo? : fi- accounts payable
what is validation &substution