cinder filling or Brick Aggregate filling in sunken portion.which one is better
Answer Posted / jagan_srinivasan2002@yahoo.co.
Cinder filling is the best one
1)Light at.material
2)It will not absorbed the water
3)cost is very cheap
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
how many tonnes equals to one cubic feet?
States some of the commonly used commands in cad software’s?
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete
WHAT DLC DESIGN IN CONSTRUCTION
residential projects,structural.
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
What is the use of mirror command?
What goals do you have in your career?
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
how many material required for brickbat water proofing of toilets.
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
how to caliculate required amount of cement and sand required for 1cu.m.
How to calculate canal slope curvature qty!
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.