Question { 2438 }

to construct 1450 rft length of 6 feet wall how much cement sand and blocks are required????


Answer

L=1450 ft
H-6 ft
Area
1450*6=8700sq.ft (or)808.55 sq.M
Block required for one sq.m-12nos
Total qty of block required -9702.6 say-9700 nos
Cement required is
11 to 15 mgs for sq.m (depending upon the ratio )

Is This Answer Correct ?    0 Yes 0 No

Question { Chenab Valley Power Projects, 4425 }

cinder filling or Brick Aggregate filling in sunken portion.which one is better


Answer

Cinder filling is the best one
1)Light at.material
2)It will not absorbed the water
3)cost is very cheap

Is This Answer Correct ?    0 Yes 0 No


Question { College School Exams Tests, 4225 }

why are use steel with conc. instead use of other type materials.


Answer

1)Steel has good tensile stress
2)it will develop the good bond streets with concrete
3)Modulus of elacticy is high

Is This Answer Correct ?    0 Yes 0 No

Question { Al Latifia Trading Contracting, 7411 }

what is daily progress of a steel fixer average
how many kilograms he can fix in 8 hours average


Answer

100kgs/day/fitter

Is This Answer Correct ?    5 Yes 7 No

Question { Symphony, 2063 }

for basic costing, how can we calculate how much amount of steel and cocrete will go in per sqft? and what are the thumbrules?


Answer

3 to 4 kgs per sqft

Is This Answer Correct ?    0 Yes 0 No