If a load test has to run for 4 hours with 2,000 users, and
the average iteration completes in 10 minutes, how many
transactions will run per minute? can any give the calculation
please.
Answer Posted / sharmila rahman
Time taken for one iteration to complete = 10 min
No of iteration completed in one min(1 User) = 1/10 = 0.1
No of Iteration completed by 2000 users in one min = 0.1*2000 = 200
Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
What are the 5 icons appear in the buttom of the controller windows?
What are the capabilities exactly you look for while selecting the performance testing tool?
What is vuser-end section?
How do you load a load runner agent?
What is manual correlation?
What is the basic credentials should be provided while recording SAP-GUI?
What are the four selection methods when choosing data from a data file?
How you set maximum number of vuser that a host can run?
How does loadrunner execute a performance scenario?
What is performance testing in loadrunner?
What is a correlation? Explain the difference between automatic correlation and manual correlation?
How do you enable text and image checks in vugen?
What are the different types goals in goal-oriented scenario?
While scripting you created correlation rules for automatic correlation. If you want to share the correlation rules with your team member working on the same application so that he/she can use the same on his workstation, how will you do that?
How can we develop the database vuser script?