How to calculate busbar size & what is the procedure we
make for determine that?

Answer Posted / kamran

dear, can you explain how is find factor copper (1.6 or 1.3) and Aluminum (0.8). also incase we are calculate busbar 50ka outdoor so how can calculation. i need your help.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

WHY THE RATINGS OF THE TRANSFORMER IS 33KV WHY NOT OTHER???

1926


what is meant by directional earth fault and non directional earth fault? describe both.

1464


WHAT IS AIR GAP VALUE IN MM FOR A 11KV BUSHING OF 11KV/440V DISTRIBUTION TRANSFORMER. AND AIR GAP VALUE OF 25 KV BUSHING OF AT TRANSFORMER OF 25 KV TRACTION. WHAT IS THE CALCULATION FOR THE AIR GAP PERMITTED FOR BUSHINGS AT DIFFERENT VOLTAGES.

3045


how to calculate mf when meter and cTPT detail are given

1361


who can measure the size of power cable?

1568






what is effect of leading power facter on the system and billing

1784


Hello Friends, How can we recognize the CT Star Point is S1 or S2 in case of Electro Mechanical Relays and what is meant by Restraining coil in relays and what is the purpose of that.. thank you in advance..

1678


What is class ab operation?

641


As per standard, transformer body earthing and other Equipment earthing (Equipment earthing) did not connect. but in LT side termination we are doing metal glanding in both side Transformer to PCC Panel through armoured cable, now X'mer body earthing and PCC Pane earthing (Equipment earthing) both are connect.is this safe for X'mer or other equipment?

1197


What are the Full Forms of TVM, MTL, CVT ?

917


1)we have 1000 cfm Blower,Dia-1Mtr,Velocity of air 94 m/s 2)We have Natural Air velocity 94m/s 3If i Put Wind Mill in natural air ,speed is 94m/s Then it will generate Assume 100kw 4)If i put same wind mill across the Blower,air speed is same 94m/s now the Question is Will it generate 100 kw?

1513


What is Negative Potential Bias

1787


What are the roles and responsibilities of electrical engineer in cement plant

1518


what would u consider to be the basic purchase order information you would need to proceed with a cable inspection assignment?

1470


How to work meggar?

1363