How to calculate the amount of Brick,cement & sand required
for 1 cum of 230mm thick brick work with ratio 1:5 please
give me an answer with detailed step
Answer Posted / mohamed alfaiz
actual volume brick ------- 19cm x 9cm x 9cm = 0.0015m3 (1m3/0.0015)=666.66 nos
thickness of mortar -------- 10mm
volume of brick + mortar------- 20cm x10cm x 10cm =0.002m3 (1m3/0.002)=500 nos
=(1m3 -500/666.6)
=0.25m3 of mortar
quantity of cement required
unit wt of cement 1440kg /m3
ratio 1:5
=1440/5
=288kg/m3 x 0.25m3
72kg/50kg per bag
=1.44bag of cement
sand
0.25m3
9cft
Is This Answer Correct ? | 10 Yes | 1 No |
Post New Answer View All Answers
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
how to create our resume?
rate analysis for cement pointing 1:4 , for 100 sq m
What do you mean by honeycomb in concrete?
How much of the strength of concrete comes from post- production curing?
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
what is the ingredient value of 40mm and 20mm aggregates?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
Define What is unit weight of normal concrete?
what is the basic difference between Coloumn & Shear Wall
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN