Without routing we can create production order..?? If yes how....?
Answer Posted / sonal
Set up routing optional in order type dependent parameters for allowing system to create production order without routing.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Suppose the client wants me the vacancy to be displayed on a website as well as ess. How should I do it?
Explain different inspection type you used .
Explain In-process inspection.
What is MRP procedure
What is mrp group and what is the use of it?
How mrp (material requirement planning) types are classified?
What are the key fields in MRP views?
What is the recruitment cycle?
How do I find which is the recurrent item in a production order? In the missing material analisys I got message MF 331, but the BOM or the production order don'thave any recurrent item Thanks
List out the basic procedure for dispatching operations in capacity leveling?
You want to integrate pp with fico. What steps would you take?
We have a lot of size procedure here which is creating more order proposals. How do you set the limit value for the maximum number of mrp order proposals per date in img?
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
Explain source inspection.
any one can provide me some sample resume for SAP PP with 0 to 1 year experience?