What is the configuration done for Order type dependent parameter and confirmation parameter

Answer Posted / eswar

Maintain parameters for routing selection, Operation & BOM Application. And in Implementation view activate status change documents, update  shopfloor information system & documentation of goods movements, as per your requirement and in controlling view maintain costing variants & result analysis key and default rule.
OPL8

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Mention what is the use of t-code cs20 in bom?

648


What is end user training

1557


what are Standard keys

1649


Difference between Item categories or what is variable size item or non stock item.

2098


How do I find which is the recurrent item in a production order? In the missing material analisys I got message MF 331, but the BOM or the production order don'thave any recurrent item Thanks

2517






Question related to Production order status or status profile?

1036


Explain the planning steps for 100 products?

642


What are all the ‘technical types of bom’?

642


What are all the 'sub-components' of production orders?

603


What are gaps? Some examples?

591


Special Procurement type 40 – proc. form alt. plant

2154


In cost controlling information system mention the fields that are listed in the list screen of the report?

695


List out the activities carried out in production planning?

599


What is the use of data in work centers?

670


• How are basic order dates determined?

1776