What is the configuration done for Order type dependent parameter and confirmation parameter
Answer Posted / eswar
Maintain parameters for routing selection, Operation & BOM Application. And in Implementation view activate status change documents, update shopfloor information system & documentation of goods movements, as per your requirement and in controlling view maintain costing variants & result analysis key and default rule.
OPL8
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Mention what is the use of t-code cs20 in bom?
What is end user training
what are Standard keys
Difference between Item categories or what is variable size item or non stock item.
How do I find which is the recurrent item in a production order? In the missing material analisys I got message MF 331, but the BOM or the production order don'thave any recurrent item Thanks
Question related to Production order status or status profile?
Explain the planning steps for 100 products?
What are all the ‘technical types of bom’?
What are all the 'sub-components' of production orders?
What are gaps? Some examples?
Special Procurement type 40 – proc. form alt. plant
In cost controlling information system mention the fields that are listed in the list screen of the report?
List out the activities carried out in production planning?
What is the use of data in work centers?
• How are basic order dates determined?