Hi All,

This is regarding ETL testing. I have 3.5 years of
experience in software testing. I have used web and DB
testing so far. I am currently projected for ETL testing by
using which is very new to me. We are using Informatica for
running the sessions and taking the logs. I would like to
know whats the process we have to follow for this testing.
Ie., From kickoff to signoff. Can please anyone give brief
explanation on that.

Do we have any certification for ETL Testing??

Answer Posted / sethu

Hi Wayne please send me a copy to nsethu513@gmail.com

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the layers of FCOE Protocol?

1430


Explain a variable?

557


Could reviews or inspections be considered part of testing?

1463


What is control structure testing?

619


What is test incident report?

565






WHAT ARE THE VARIOUS RISKS INVOLVE IN TESTING?

1855


What is differences between SCS-1,2 and 3

1417


What is stochastic testing?

621


IN integration testing tester should knowledge of code or not?

1699


Please anyone guide where i can get the questions on Rational Test Real Time testing tool. Because i have to write exam on RTRT.

1508


When you will deploy Fibre Channel SAN instead of iSCSI SAN?

1874


What is the term for decomposing a software program so that latent design information can be extracted? 1. Reengineering 2. Regression 3. Restructuring 4. Reusability 5. Reverse engineering

1755


What are the best practices for software quality assurance?

592


When usin qtp iam able to get the data from the database only in a single row that is if i have 2 columns in database,when using database output value , all the values in Database are transfered to a single row in QTP datatable. I want the values to appear as it is from the database , can anyone suggest some ideas?

1484


Test report?

603