I have 30 kw motor load & i have selected 10 kvar capacitor bank for power factor improvement.my existing p.f is 0.85 & proposed p.f is 0.99 so ,is it right selection?
2 nd question how to connect c.bank whether in delta or star connection & how to decide it?
Answer Posted / bhaskarenterprises1
as per electrical calculations if we want maintained .99 pf we should have 14.31KVAR is sufficient.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF Govt Polytechnic in deee 2nd year papers
list of tests to be carried out at manufacturers end while purchasing a step up transformer of 11kv to 66kv ,2MVa Capacity.
what is the calculation involved to design the heater to heat 10KL of water in temperature control unit?
plz tell me,ht and lt panel terminals in substations explain beiefly
why ahould you show client/engineer activities clearly on the project plan
What is the reason for using a GE G101 MCB in place of an EP102 MCB if both are capable of AC circuit protection?
What is transient response?
what is meant by flywheel and its role in retardation test
How could a garment factory benefit from renewable energy
what is the relationship between phase & neutral
What are the material used for resistor?
In india, according to trade theory above 5 HP motor reqired star delta starter. But we R connect 11 KV motor with 14MW in Direct to line ( With VCB starter combination) Can U Guess, How it is possible ?????
how we can calcultae the short circuit level for bus bar
can we use engine degreaser for electrical motors?
How to choose the vector group for the step up and step down transformers??? Tell me the which vector group is suitable for step up and step down transformers and whats the reason to choose and whats the benefits???