I have 30 kw motor load & i have selected 10 kvar capacitor bank for power factor improvement.my existing p.f is 0.85 & proposed p.f is 0.99 so ,is it right selection?
2 nd question how to connect c.bank whether in delta or star connection & how to decide it?

Answer Posted / bhaskarenterprises1

as per electrical calculations if we want maintained .99 pf we should have 14.31KVAR is sufficient.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF Govt Polytechnic in deee 2nd year papers

2306


list of tests to be carried out at manufacturers end while purchasing a step up transformer of 11kv to 66kv ,2MVa Capacity.

1562


what is the calculation involved to design the heater to heat 10KL of water in temperature control unit?

1484


plz tell me,ht and lt panel terminals in substations explain beiefly

2350


why ahould you show client/engineer activities clearly on the project plan

2355






What is the reason for using a GE G101 MCB in place of an EP102 MCB if both are capable of AC circuit protection?

2170


What is transient response?

671


what is meant by flywheel and its role in retardation test

1971


How could a garment factory benefit from renewable energy

2356


what is the relationship between phase & neutral

2074


What are the material used for resistor?

640


In india, according to trade theory above 5 HP motor reqired star delta starter. But we R connect 11 KV motor with 14MW in Direct to line ( With VCB starter combination) Can U Guess, How it is possible ?????

1611


how we can calcultae the short circuit level for bus bar

1735


can we use engine degreaser for electrical motors?

1303


How to choose the vector group for the step up and step down transformers??? Tell me the which vector group is suitable for step up and step down transformers and whats the reason to choose and whats the benefits???

1839