What is recurring sheduling and batch scheduling?
Answer Posted / karimulla shaik
Recurince schedule is to run report with same frequency with specified time interval .
Ex .day wise,
Week wise,
Hour wise etc.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How would you format some text using css to be verdana and bold?
What is the difference between absolute and relative div positioning?
Explain what are the measure objects?
explain in detail about type 3?
Explain are data mart and data warehouse normalized or denormalized? Do both of them exist in?
webI report not showing Barcode in PDF format, i have used BC39 font,but barcode is shown in HTML but not in PDF, please any solutions??
Explain what task is 98% of the required work of a business analyst?
Regarding Hyperlinking in Business Objects. We have a few reports in QA environment where a number of hyperlinks are employed using OpenDoc function.In some of the reports,hyperlink is used to move to another tab within the same report.The formula used include "DocID" and ReportName="tab name".This works fine but now,for the PROD move,this will not work as the Doc Ids are subject to change. Is there a way to overcome this?Without DocID,how will move to a particular tab? Thanks in advance
Explain is data mart?
What is object stores?
Explain how can we do load testing for webi reports? (Example if I have have to test one webi report for concurrent users refreshing report at one time)?
Explain which versions are used in the bo dashboard work?
Explain is there any tool that can compare two unvs / two rpts , built using bo 5.1 / bo 6.5?
Explain what sort of existing documents should business analysts refer to when starting on a new project?
what is document design in boxi,have u participate in that