neutral earthing is the process of connecting the star point of a 3 phase system to earth whereas equipment earthing is the process of connecting non current carrying part usually the metal frame of an equipment to earth.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
I am going to appear RRB Sr. Section Engineer Exam, Electrical. Can you send me previous year questions of RRB Electrical engineer. specially Section Engineer questions. my email id is likerahulworld@gmail.com
PLEASE SEND THE PREVIOUS YEARS QUESTION PAPERS OF RRB JUNIOR ENGINEER-ELECTRICAL
How can we connect additional batteries to three phase ups? What are parameters we have to check when connecting?
What is cut-off rate?
L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.
A 2083kva AVR was tested, phase to ground shows continuity, what is the implications
difference between servo motor and synchronous motor
I AM A ELECTRICAL PANEL BOARD DESIGN ENGINEER.IF I GO ANY INTERVIEW ,TECHNICALLY WHAT ARE QUESTIONS I WILL FACE FROM INTERVIEWER?
what is two point starter?
How we calculate the current carrying capacity of H.T. cabel?
how do prepare ongc exam.how is it question model.i am electrical. which part covering in electrical.tell me
I am using submission of two ct in one and half scheme for 67/67N protection. Both CTs star point is grounded separately near ct box.Will two point ground give wrong tripping to 67/67N during fault or no matter.
what is the formula of starting current of 3phase and 1 phase motor???
why swinburnes test cannot be performed on series machines?explain
Its possible to use 3core 2R of 240 sq.mm cable for 3phases & separely 50sq.mm 3core cable fully for Neutral for connection of PCC to MCC 3ph..4wire system?