Answer Posted / j c gogoi
In india maximum permissible loads (sbc) shall not exceeds 3 mpa. Further, rqd and joint spacing has a vital role in s b c estimation. A lone piece of rock may sometime shows higher ucs which may lead to misunderstanding of behaviors. In addition to this, our indian codes suggested to consider soft and jointed rock mass as soil deposit. In the stated case of sand-stone, in my opinion, it is better to adopt a sbc of maximum 50 tonnes/sq m.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to determine spacing of bars in slabs or beams
water leak detection system question & answer
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
What is meant by scaffolding coefficient?
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
What is bylayer?
Calculation of Pier Cap with tapper area?
How to estabilish reinforcement Steel rolling margin for a building projects ?
what is project?
what's the formula for calculate pcc for matt(45mm aggregate)?
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
Define current ucs?
Which is the latest version of solidsworks?
Explain what is alternate bid?