If production order released for 100 pieces you done GR for 50 pieces and technically closed, after some days you can do GR for 50 pieces
Answer Posted / rashmi kant
We can reserve Material by T-code MB25.So that we can reserve materials against order number.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is standard order type
Explain what happens to plan after it has been converted into production order?
What is Inspection Points?
What is requirement class and requirement type?
Scheduling times can be defined in the material master record by?
How requirements( pir, sales order, customer requirement) are reduced after they are produced?
Suppose the client wants me the vacancy to be displayed on a website as well as ess. How should I do it?
In cost controlling information system mention the fields that are listed in the list screen of the report?
What is Phantom Assembly?
Explain DMR.
We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
Explain the lsmw and the steps involved in them.
Mention what is the t-code for changing production order and to display production order?
What is internal payroll process?
How you get the ticket?