Scenario : I have 2 jobs say job A and Job B with parameters x and y respectively. I need to create a sequence job. If we pass parameter x then Job A should run, If we pass parameter y then Job B should run, if we dont pass any parameter then Both Job A & B should run.
Answer Posted / sindhu
by using scripts we can do it
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How do you start developing a datastage project?
how to achieve this output ? Two Input columns(ID & Name) - ID | Name 1 | Jack 1 | Kara In output there should be only 1 column which will be populated as - 1,Jack 1,Kara
how to implement scd2 in datastage 7.5 with lookup stage
what is the difference between == and eq in UNIX shell scripting?
options available in sequence job to run,validate?
How do y read Sequential file from job control?
what is flow of project?
Define Merge?
Differentiate between Join, Merge and Lookup stage?
What are the benefits of datastage?
How rejected rows are managed in datastage?
What is the difference between datastage and informatica?
if we using two sources having same meta data and how to check the data in two sources is same or not? and if the data is not same i want to abort the job ?how we can do this?
What is use Array size in datastage
Where do the datastage jobs get stored?