1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"
Answer Posted / ashok sharma
Standard brick size in meter=.190*.090*.090 =.00154
add 10 mm mortar for ech sides=(.2*.1*.1)=(.002)
bricks required for 1 m3 =(1/(0.002)=500 nos
mortar required =(.002-.00154)*500=.23
add 10% for wastage = (.23*0.1+.23)=.253m3
add 25% for Dry Volumn = (.253*0.25+.253)=.316m3
Send is =(6/7)=0.857*0.316=0.271 cum = 9.571 cft
cement is =(1/7)=0.143*0.316=0.045*1440= 65 kg
Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
what is the effect of duration of earth quake on framed structures ?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
can any one explain bar bending schedule of bems and columns and slabs ??
What are the skills required to become an architect?
Test procedure of fly ash bricks as per code ?
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
what is w/c ratio in dry lean concrete for m10 mix design
Explain the different types of roofing systems?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
Define What is diversion tunnel in a dam?
significance of specific surface area of particles?
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
what is project?