As soon as we get the build what type test we will do?and
how?
Answer Posted / yogesh kolhe
As we get the build we do the BVT(Build verification testing) or Smoke testing to verify that build is appropriate and all the major functionality of the application is working as per the flow.We do check that any blockage comes or not and if yes then workaround for that blocker.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is difference in between operating system 2000 and os xp?
What are the different servers and difference between them?
Explain the components of a test plan?
What are the review documents used for testing?
What are the bussiness scenories?
What is test startegy?
Is an "A fast database retrieval rate" a testable requirement?
what is the difference between Risk based and Requirement based testing???
I am DD. I am working as a Tester in e-learning company? IS there scope for content testing? or i have to change to software testing. pls guide me...
What exactly you do as a Configuration controller?
What is integration level testing?
can u plz give an example for regression testing with example.
What is strategy to be followed for execution of 500 Test Cases in One day. If only 1 Resource is available.
How to find bug in photos and videos ??
what is difference between win 98 and win 2000 poertating system?which is better one?