As soon as we get the build what type test we will do?and
how?

Answer Posted / yogesh kolhe

As we get the build we do the BVT(Build verification testing) or Smoke testing to verify that build is appropriate and all the major functionality of the application is working as per the flow.We do check that any blockage comes or not and if yes then workaround for that blocker.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is difference in between operating system 2000 and os xp?

669


What are the different servers and difference between them?

1616


Explain the components of a test plan?

691


What are the review documents used for testing?

1572


What are the bussiness scenories?

2646






What is test startegy?

785


Is an "A fast database retrieval rate" a testable requirement?

1527


what is the difference between Risk based and Requirement based testing???

1715


I am DD. I am working as a Tester in e-learning company? IS there scope for content testing? or i have to change to software testing. pls guide me...

1675


What exactly you do as a Configuration controller?

1547


What is integration level testing?

705


can u plz give an example for regression testing with example.

1609


What is strategy to be followed for execution of 500 Test Cases in One day. If only 1 Resource is available.

1489


How to find bug in photos and videos ??

1749


what is difference between win 98 and win 2000 poertating system?which is better one?

1731