I have a single cycle maintenance plan that is triggered by
a counter assigned to a equipment A. If I replace equipment
A with equipment B how do I change my Maintenance plan
counter? When I use IP02 "change maintenance Plan" the
counter box is greyed out. Thanks for any advice.
Answer Posted / mahendra
Create a new counter and plan for equipment b
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What level of functional locations should be changed for alternative labelling?
What do the qs42 tcodes in sap- pm mean?
How pm module is integrated with co module?
Where is a service contract allocated to a portion of an equipment?
How to configure the integration of pp and pm, where it is being done in spro, what are the pre-requisite and what are the steps?
How pm module is integrated with mm module?
What is concept of equipment numbering?
What is breakdown maintenance?
I have scheduled a maintenance plan but I am unable to see the all due (plan) dates of maintenance order in schedule overview. Which setting will I check in maintenance plan?
What do the ia07 tcodes in sap- pm mean?
How overheades are calculated and from where the formula is picked?
How can the user delete historical maintenance/service orders in the plant maintenance?
What is call horizon? Explain with example.
What is work centre category?
Can you use call horizon and shift factors in multiple counter plan?