how do we calculate quantity of cement , sand and
aggregates in 1 m3 of M30 grade concrete ?

Answer Posted / sunil kumar yadav

Taken the ratio-1:1.5:3
cement-1
sand-1.5
metal-3
so ratio will be for mixing-1+1.5+3=5.5
Totals ingredients forusing to=1.54/5.5=o.28
cement solution=0.28 cum
send=0.28×1.5=0.42 cum
(1.5 is a maximum proportion)
metal=0.28×3=0.84 cum
(3 is a maximum proporties)
1 cum cement concrete ratio is 1:1.5:3
cement=0.28 cum
Sand=0.42 cum
metal=0.84 cum
so cemenbbage will be =50/1440=0.0347
(1440=unit wait of cement & 50=wait of 1bage cement)
so cement bags will be=0.28/0.034=8.24 bage.

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how much need sand and cement for 1 cft roof construction?

3971


why we are using stub column..? is it possible to construct steel stub column..?

1522


how to prepare site mix design

1563


How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.

3712


What is the coeffiencent Friction Angle between Steel and Ashphalt?

2524






What is Heavy Concrete & Normal Concrete

2237


what is tension footing?

1543


What is meant by engineering drawing?

664


what is the service corridor?

1921


how to convert cement, sand aggregate quantity from M3 to kg with full description?

1597


How to calculate the load of partion in flat slab if we use brick?

1393


material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water

3254


Explain what is 1/8 on the architect ruler denotes?

676


which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?

1576


What is rate of concrete surface rendering work per sqm

1440