1.challanges in project? 2} landscape of project?3}How schdule line determined? 3}whst is shelf life exp? 4}fields to be maintained in Material master for TOR & availabil check.?
5}Third party business process,if 100 order 90 del by third how to bill for 90 how to configre this ?6} what is the tax procedure used in project? 7}account assignment done ?8}whatis alt cal type ? 9} How many pricing procedure you used? 10}What is condition exclusion group & exclusion indicator ?difference bet rush order & cash order?

Answer Posted / chandra mouli

2)Landscape of project:
Landscape means arrangement of Servers.
Here, Landscape of project means it depends on your project how the landscape is designed.
SAP suggests 3 servers. They are: Development server, Quality server and Production server.

3)How Schedule line is determined?
Schedule line is determined based on MRP type and Item Category.

4) What is Shelf life?
Shelf life: These two words itself explains that it gives the details about expiry dates of a material.

5) Fields to be maintained in Material Master for Availability Check and TOR?
first,Let us know the pre-requisites of Availability Check and TOR
For Availability Check:
1)Availability check should be maintained at sales general plant view in Material Master
2)Availability and requirement should be checked in schedule line category controls
3) Availability and requirement should be checked in requirement class and
4) Requirement type should be determined into sales document. Requirement type is determined based on Strategy group,MRP Group and item category+MRP type

For TOR:
Points 2,3 and 4 which are mentioned above are the pre-requisites for TOR.

Now, Fields to be maintained in Material Master for Availability Check and TOR.
Maintain Availability check field and (Strategy group or MRP group or MRP Type+item category) in material master.

If you want requirement type to be determined from SD then maintain origin of requirement as 1 in TOR configuration steps

6) Third Party business process, if order--100 but delivery--90.How to bill for 90 & how to configure this?
Maintain Billing Relevance in item category control should be F, Billing Quantity should be F in copy controls and Copy requirement should be 012.

9) How many pricing procedure you used?
It purely depends on your project(client business process) to decide how pricing procedure to be maintained.
For Indian clients:
Domestic pricing procedure, Exports Pricing procedure, STO pricing procedure and Depot sales pricing procedure.

10) Exclusion Group: This concept is generally used to pick the either the best or least condition types to get triggered into sales document.
Exclusion: If you maintain exclusion in your condition type the below condition types will be eliminated which are having the same requirement.
You can maintain exclusion in 2 places 1---> at your condition type control and 2---> At condition record level.
If you maintain at your condition record level then it is applicable only for that record which will not affect other condition types.

If you want to use exclusion group concept then uncheck exclusion at both the places i.e.., at condition type level and condition record level.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Can anyone tell me who creates Customer Material Info Record in Live Scenraios? DO SAP SD Consultants are responsible for this?

5118


Understanding Clint business process & Relevant Sap Logic Review of Business & Technical Documention

2054


We want to explode bill of material automatically at time of order entry and explode an equipment bom in the sales order. What are the setting required?

676


What is the structure of delivery document? What are the characteristics essential for combining more than one sales order as one outbound delivery?

568


How can one inactivate or block a special stock partner? Intent is to disallow transactions to this consignment location as part of lifecycle mgmt.

1506






Define to which organizational element is central in shipping?

759


What are inter-company customers?

657


What are incoterms? Where do we fix them? Where do you find in regular process?

663


How you can extent the rebate? What are the procedures, what is the customisation for it?

666


Explain credit management.

661


How shipping point is determined?

627


I want to give rebate to the customers only those have achieved the target (say 1000 qnt. or more/ Rs. 50,000 in price) of a material in the respective period, how to configure this? (other customers who have not reached the target will not get the rebate

1417


What is a sales organization, distribution channel, division?

664


one of interviewer asked me this requirement please tell me anybody? Issue: the problem faced by us right now is,when there are more than 2 route codes available, users can select a wrong route code which is a longer route for the destination, the physical shipment can still go through a shorter route, but company will end up in paying more. Requirement: user maintained route list, the user will maintain a master from which route should be picked, users should be able to enable or disable a particular route. Thanks in advance

1217


If you want to create language specific sales texts for your material master, would you have to create a new material master record?

631