How to calculate the amount of Brick,cement & sand required
for 1 cum of 230mm thick brick work with ratio 1:5 please
give me an answer with detailed step
Answer Posted / ankush rathod
BRICK = 500
SAND = PROPORTION OF SAND IS 1:5 (1 5=6) 5/6 X 0.3=0.25CUM.
CEMENT = 1/6 X 0.3 =0.05CUM.(0.05 X 1440=72 ) 72/50=1.44
CEMENT =1.44 BAGS
| Is This Answer Correct ? | 24 Yes | 7 No |
Post New Answer View All Answers
Minimum concrete cover in slabs, columns, beams, foundation and other st?
What are the uses of alloys in daily life and how are alloys made?
What is binding spacing of the rebars at lapping zones.
Advantage of Aluminum form work in terms of activities can be skip and cost too
what is the exact dia of 8swg and 10swg gabion wire
How to calculate material and labor required for 100 m2 plaster?
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
What is the usage of zoom command?
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
what is relation between SPT N value and driving piles after conducting a soil test?
What does a construction cost covers and what does not?
how to calculate testing date
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?