How to calculate the amount of Brick,cement & sand required
for 1 cum of 230mm thick brick work with ratio 1:5 please
give me an answer with detailed step

Answer Posted / ankush rathod

BRICK = 500
SAND = PROPORTION OF SAND IS 1:5 (1 5=6) 5/6 X 0.3=0.25CUM.
CEMENT = 1/6 X 0.3 =0.05CUM.(0.05 X 1440=72 ) 72/50=1.44
CEMENT =1.44 BAGS

Is This Answer Correct ?    24 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?

2132


how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you

2119


The definition of national highway

1341


What is the usage of zoom command?

688


how to find ssm in foundation?

1435






how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')

2182


what do you mean by yeild stress of a material? What will happen when hit is given to cement?

1907


What is the difference between engineering stress and true stress?

655


What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?

1011


RR masonry rate analysis

2651


How do you calculate reinforcement weight of steel?

670


psc girder detail

2716


How do we determine the specific gravity of a cement?

655


how to nfind out the specific gravity of sand.aggregate,water please help...

1692


Sir how to find cutting length for footing steel bars in the shape of "u"

1325