1. If my rpg program has a date field, What extra care I
have to take while compiling that RPG program?
2. If the file is keyed and I have declared the file as well
as Key list properly in my program. Still am getting an
error message like "Chain/reade operation is not allowed"
What may be the case?
Answer Posted / vivek
Program actually works when we not use K IN F SPEC. have tested then posted
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is data area and how it is used in rpg program ?
what is the rpg system?
How would display prime numbers using CL program?
how can you display specific subfile page on the screen in unequal subfile?
How to declare the pull button in AS/400..
what is file information data structure?
are there any useful c runtime apis that I can call from rpg iv?
How many program bind in one module....
thanks mr.Harshad R Suryawaunshi,i'm new to as400 i think you are telling in rpgile i know only rpg400 if possible can you tell in rpg400
Interviewer asked me write down DDS for load all subfile .can anybody write dds
What is the purpose of record level identifier?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
how does the rpg element work?
What are the types of identifiers?
what do you mean by an input subfile, what are the keywords required?