1. If my rpg program has a date field, What extra care I
have to take while compiling that RPG program?
2. If the file is keyed and I have declared the file as well
as Key list properly in my program. Still am getting an
error message like "Chain/reade operation is not allowed"
What may be the case?

Answer Posted / vivek

Program actually works when we not use K IN F SPEC. have tested then posted

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is data area and how it is used in rpg program ?

756


what is the rpg system?

667


How would display prime numbers using CL program?

5678


how can you display specific subfile page on the screen in unequal subfile?

673


How to declare the pull button in AS/400..

1879






what is file information data structure?

1372


are there any useful c runtime apis that I can call from rpg iv?

700


How many program bind in one module....

2121


thanks mr.Harshad R Suryawaunshi,i'm new to as400 i think you are telling in rpgile i know only rpg400 if possible can you tell in rpg400

1895


Interviewer asked me write down DDS for load all subfile .can anybody write dds

1017


What is the purpose of record level identifier?

728


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

1761


how does the rpg element work?

716


What are the types of identifiers?

570


what do you mean by an input subfile, what are the keywords required?

773