form work including the props can be removed from beams only after
Answer Posted / subhayan
depends on span for upto 6m 14 days and more than that 21days
Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
acceptance criteria for concrete works
what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.
how to calculate rate analysys of 1:6 plastering 10 sq m
Which architectural movement is also known as jazz moderna?
how to calculate the concrete mix m30 by volume
how to preaper for interview wat they asked in interview give me idea
what is BPM in concrete demolition hammers. what is better a higher value or lower
What is the strongest bridge for a school contest?
In case if concrete box girder bridges how is the number of cells determined?
Rate analysis of Vitrified tile in cement mortor 1:3
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
How to construct a water sump in a rocky soil?
why +1 to be followed for calculating the no of bars in BBS. Please explain
Specific gravity of cement?
is basic cost of the material includes tax?