form work including the props can be removed from beams only after

Answer Posted / subhayan

depends on span for upto 6m 14 days and more than that 21days

Is This Answer Correct ?    4 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

acceptance criteria for concrete works

1683


what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.

1739


how to calculate rate analysys of 1:6 plastering 10 sq m

2503


Which architectural movement is also known as jazz moderna?

832


how to calculate the concrete mix m30 by volume

1093






how to preaper for interview wat they asked in interview give me idea

2171


what is BPM in concrete demolition hammers. what is better a higher value or lower

2234


What is the strongest bridge for a school contest?

712


In case if concrete box girder bridges how is the number of cells determined?

709


Rate analysis of Vitrified tile in cement mortor 1:3

3935


Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct

1017


How to construct a water sump in a rocky soil?

1697


why +1 to be followed for calculating the no of bars in BBS. Please explain

1508


Specific gravity of cement?

1206


is basic cost of the material includes tax?

1531