Answer Posted / k r kumar ranjan
Normally In Coal based thermal power plant(Either Sub or Super Critical) 60% Bypass is adopted based on condenser heat load calculation keeping 0.9 as Condenser Cleanliness Factor.
If Some designer wants to bypass 100% of generated steam, it is also possible. In fact most Nuclear Steam Turbine adopt same for same reactor shutdown process.
Increase in % capacity of bypass system increases capital cost involved in condenser cooling surface, Extraction pumps, LP Heaters, Pipe Sizing etc.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How We Calibrate the vaccum transmitter?
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
LAPT working in alternator / generator
explain how the third harmonic content of the magnetising current affects transformer design
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
why airtel use + 24 volts and other operators use -48 volt
some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor
what's the moog valve
procedure of how to generate power in solar plant.
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
what is restricted earth fault explain in details
what is the meaning of SST300 V56A in SIEMENS turbine
Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.
Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.
why do you consider yourself a suitable candidate for this position