Answer Posted / chinmay kumar patra(npti)
In case of high pressure turbine specific volume is less so less space is required.Singe pass design is satisfactory so no need of reduce the size by double pass designing.High pressure is maintained at outlet by using 1 or 2 impulse stage at starting stage so after reheating it must be able to reach up to last stage fr high work done.So high pressure at O/L of HP turbine is needy.So single pass design.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
By any way can we increase the B check hours from 300 to 500
what is the basic use of power plant in equipment
what is restricted earth fault explain in details
what's the moog valve
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
what is the trip circuit supervision in an electrical meaning?
What is LB-SR.
What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?
operation
some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor
what is the difference between compensated & normal drum level in boiler drum?
Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?