You can enter default values for operation and sub-operations in work centers. The default values are then copied when you assign the work center to the operation or sub-operation.
By entering default values you reduce the effort necessary in editing operations, since the values are stored centrally and you do not need to enter them in each operation.
Default values in work centers are for instance:
Wage type and wage group
Control key
Standard text key
Suitability
Setup type key
Activity type
Units for the standard values
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What are all the steps involved in Variant Configuration?
Is it possible to convert a 'multiple bom' into a 'variant bom'?
What are the MRP master data?
What is the need of mrp list if the stock requirement list is already given?
Explain variant configuration
Can't one material be assigned to more than one operation in a routing, why?
What does the use of ms70 followed by mcec get you?
Explain Planning file entry.
Define standard cost
What is processing class, where we do them and why?
Mention what is the use of t-code cs20 in bom?
In lsmw which is most important step?
Two or three Production Orders are there for the same day, and goods are not sufficient and then how to proceed?
What is the role of an administrator in pa?
What is meant by payscale structure?