Answer Posted / dines kumar
GAP Analysis is of finding difference between AS-IS and
TO-BE. It is carried out to know which areas are remaining
untouched as far as project is concerned. In short GAP
Analysis provides documentation on areas that still needs to
be worked out.
Please correct me if I am wrong.
| Is This Answer Correct ? | 14 Yes | 0 No |
Post New Answer View All Answers
What is the planning horizon?
Can't one material be assigned to more than one operation in a routing, why?
What is the use of t-code cs20 in bom?
What are traffic lights in mrp?
Explain why their is need of production version ?
Integration between PP and PM module.
What are sequence, parallel, overlapping, splitting and where can we assign these
How is the processing time calculated in a wc when both labor, machine categories exist?
How to delete a group of products that was created in screen mc84 ?
a company needs 12 standard values. how it can be maintained?
What is purpose of schedule margin key?
Where have we to specify the teardown time in one operation?
Explain why there is need of production version?
Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN
What do you do to run MRP for just one MRP Controller?