I need to plaster an area of 1500 square meter. how much
quantity of cement and sand need for this.?
Answer Posted / durgam
i need for 500sqm platering works ratio is 1:3 and how much required cement
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Explain what is 1/8 on the architect ruler denotes?
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
What is meaning of FREE STANDING STAIRCASE ?
What is the difference between built area and super built up area?
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
What do we mean by partial moment release ??
Explain major difference between auto level and dumpy level?
What out turn civil works
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
What is the Null Point of chimney in Power Plant
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
what"s the sort of beams?
What is min thickness,min grade of conc & age of PQC ?