I need to plaster an area of 1500 square meter. how much
quantity of cement and sand need for this.?

Answer Posted / durgam

i need for 500sqm platering works ratio is 1:3 and how much required cement 

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain what is 1/8 on the architect ruler denotes?

673


What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?

1451


Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.

1995


What is meaning of FREE STANDING STAIRCASE ?

2501


What is the difference between built area and super built up area?

688






is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.

1505


What do we mean by partial moment release ??

3365


Explain major difference between auto level and dumpy level?

748


What out turn civil works

6352


plz drive the formula d2/162.162 for the calculation of weight of steel bars????

36396


What is the Null Point of chimney in Power Plant

3266


How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.

1010


To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?

1500


what"s the sort of beams?

1821


What is min thickness,min grade of conc & age of PQC ?

8504