What is the Steel bar spacing formula for Concrete Slab?
Answer Posted / omar
(Area of steel-required- /1000) = (Area of one steel bar/S)
find S
then:
the answer will be ΦX/ each S
Is This Answer Correct ? | 19 Yes | 7 No |
Post New Answer View All Answers
Formula for calculation volume of essentric footing
What Are The Steps Involved In The Concreting Process, Explain?
How do you determine specific gravity of cement?
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
Why should pumping be not used in case of concreting work?
I want to join bhel because
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
what is the mix design for M:60 with micro silica andmetakaoline?
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
What is oneside mat. And explain
Does brick grows bigger every year?
what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
what would be the design load of R.C.C Cooling tower per cell.?
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?