why high pressure heater will take after sufficient pressure?
what happen when high pressure heater will take from COLD
REHEAT line at light up time when hp and lp by pass in
service.(means can we heater take at low pressure?)
Answer Posted / chinmay kumar patra
feed water temperature will be very high ie above design temperature.so super heater temperature will be very high .there is a chance of SH tube rupture due to less heat exchange.also we have to load gradually and loading on BFP will be more.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How do you consider that you can improve and what assistance do you need to achieve this
why airtel use + 24 volts and other operators use -48 volt
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
what does mean by kva rating
How We Calibrate the vaccum transmitter?
im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much
how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
procedure of how to generate power in solar plant.
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
explain how the third harmonic content of the magnetising current affects transformer design
Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.
Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.
what is restricted earth fault explain in details
By any way can we increase the B check hours from 300 to 500