A cow is tethered in the middle of a field with a 14 feet
long rope. If the cow grazes 100 sq feet per day
approximately. What time will be taken by the cow to graze
the grazeable area of the field?

(a) 2 days

(b) 18 days

(c) 24 days

(d) 6 days

(e) None of these

Answer Posted / niveditha

Area of the field grazed = [22/7*14*14]sq.ft. = 616 sq.ft.
  Number of days taken to graze the field = 616/100 days
  => 6 days(approx.)

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

4 couples have a party.Depending on the set of statements,find who insulted whom and who is the host of the party.

874


A car has run 10000 miles using 5 tyres interchangably,To have a equal wornout by all tyres how many miles each tyre should have run. answer 4000 miles/tyre

788


if for h hours of work the salary is s and the employee gets x hours of medical leave, then what is the salary/hr ?

719


12 men can build wall of length of 12m in 10 days how many men are required to build 20 m in 15 days.

792


Light glows for every 13 seconds . How many times did it glow between 1:57:58 and 3:20:47 am.

1621






tickets numbered 1 to 20 are mixed up and then a ticket is drawn at random. What is the probability that the ticket drawn has a number which is a multiple of 3 or 5?

752


With a 4/5 full tank a vehicle can travel 12 miles, how far can it travel with a 1/3 full tank

1274


In a box there are four different coloured bells,of some quantity (4 each ) what is the minimum number of pick ups so that, atleast 2 of them of the same colour.

743


There are 150 weights .Some are 1 kg weights and some are 2 kg weights. The sum of the weights is 260.What is the number of 1kg weights?

903


There is a room with 6' x 8'. A 1' tile is fixed along the 4 walls in one row. How many 1" tiles require to finish the work.

1381


One dog tells the other that there are two dogs in front of me. The other one also shouts that he too had two behind him. How many are they?

1102


Asian paints takes a contracts to paint 3 houses. Mr. White can paint a house in 6 days while Mr.Blue would take 8 days and Mr.Red 12 days. After 8 days Mr.White goes on a holiday and Mr. Blue begins to work for a period of 6 days. How many days will it take Mr.Red to complete the work?

719


A son and father goes for boating in river upstream . After rowing for 1 mile son notices the hat of his fathe falling in the river. After 5 min. he tells his father that his hat has fallen. So they turn around and are able to pick the hat at the point from where they began boating after 5 min. Tell the speed of river.

714


f(X)= 2X-1 + f(X-1) if X is not equal to zeroandiff(X=0)=0, If f(f(X))=81 then the value of X=?

740


A thief steals half the total no of loaves of bread plus 1/2 loaf from a bakery. A second thief steals half the reaming no of loaves plus 1/2 loaf and so on. After the 5th thief has stolen there are no more loaves left in the bakery. What was the total no of loaves did the bakery have at the beginning.

904