what is work of CTPT in 33/11kv Substation

Answer Posted / rich sawe

CTPT - The Current Transformer and Potential Transformer,
these are instrument transformers used mainly for high voltage instrumentation purposes at the substation

1.Measurement purposes;these transformers provides low level signals to the metering equipments to measure line voltage level and line currents at the substation.

2.Protection purpose;these transformers provides signals to the upon occurrence of fault , over-current and under-current faults are firstly sensed by the current transformers then signals the O-C/U-C RELAY to trip the Circuit breaker ,Over-voltage and under-voltage faults is firstly sensed by Potential Transformer then signals the O-V/U-V RELAY to trip the Circuit breaker.

3. The occurrence of unbalanced fault condition in three phases at the substation is detected by the current transformers and potential transformers and the signal is fed to the respective relay to operate the circuit breaker.

4.on the POWER GRID the performance and operating status of the HIGH VOLTAGE SUBSTATION are monitored and controlled through feedback from CTPT

...DIT TANZANIA...

Is This Answer Correct ?    7 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is charger supervision and control supervision?

1514


state the working principle of incondenscent tube?

1516


What is real time power factor control panel(RTPFC)?

3816


can any one suggest me the tilt angle of my solar pannel ?? or tell me how can i know the fix tilt angle of my solar pannel?? my cordinates are 31.503629,72.993164.

1374


H.t motor 6600 volt to same motor lt supply 440volt supply applyed to h.t motor to effect....

1464






I am using submission of two ct in one and half scheme for 67/67N protection. Both CTs star point is grounded separately near ct box.Will two point ground give wrong tripping to 67/67N during fault or no matter.

1643


What are the main faults of DC generators?

2357


How to calculate the efficiency of Turbo Generator(Alternator) in general....?

2238


what is RNG in the DG synchronizing by PLC?

1619


Maintenance of transformer???

1800


Sir,In our company there are 3 caterpillar make(capacity:(1) 3.3KV,2.5MW(2)3.3KV,2.5MW & (3)3.3KV,1.9MW) & 1 deutz make (capacity:11KV,3.8MW)gas engines utilised,all are running in paralell. There are three transformer utilised,(1) 6.25MVA,3.3KV/22KV,Impedence voltage:6.7% used for two generator,both are 2.5MW(2)5.5MVA,3.3KV/22KV,Impedence voltage:7.2% used for one generator of 2.5MW & (3) 5.5MVA,11KV/22KV,Impedence voltage:7.8% used for one generator of 2.5MW.all generator breakers capacity of 1250Amps. Sir,I want the details of fault level calculation of generator,transformer individually & for whole system. If you require any information from me.feel free for contact me sir.pl.send the answer of my question as the earliest as possible.

1651


WHAT IS MEANT BY TV TERMINAL IN 500MVA TRANSFORMER?

1703


how does grading rings & spacers in transmission line works? Working Principle?

1595


What is a feedback in control system?

746


What are the roles and responsibilities of electrical engineer in cement plant

1511