how cubic feet cement,sand,aggregate required for 1 cubic feet
ratio=1,1.5,3
Answer Posted / darshandachchu@gmail.com
cement=403.5kg
fa=.42cum
ca=.84 cum
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
what is the water cement ratio for plastering
Why should you consider yourself fit to be hired by jindal steel.
Why do you want to work here
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.
What is meant by Crystal Concrete?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
what is total volume of ingredients used in concrete accordingly
rimmer in pile foundation
If specific gravity of cement is less than 3.15 what is the cause?
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.