Sir what reason the deshuttring of column 1 day after casting and slab deshuttring time 14 days after casting 

Answer Posted / rethina kumar

generally concrete is strong in compression, weak in tension, that is reason we providing reinforcement in tension zone.

1.column is compression zone, so one day is enough to deshutter
2.slab is tension zone, so it need minimum 14 days to deshutter

Is This Answer Correct ?    30 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate 1 brss for RCC work  

1610


What are the alternate material for steel, Sand and aggregate

1827


As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low

1063


how we calculate the vol.of wet concrete..?

1407


Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used

4272






What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.

1330


What is min thickness,min grade of conc & age of PQC ?

8489


whaat is blister in box girder bridge and what is its function..

4376


Specific gravity of cement?

1201


how to convert sand in Cft to Kgs

1477


What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?

2155


Which are the top apps for you civil engineer?

719


why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.

1464


How to fix toll charge for a particular vehicle at toll booths in a highway?

1489


what is features of a typ-ical modern air-conditioning installation?

1495