In colomn reinforcement when dia of bar is going to change,
than what should be the lap length of bars weather it should
be of heigher dia bar lap length or it should the accordance
with new dia bar. the grade of concrete is same.

Answer Posted / ankit hooda

Lap lenth varies for grade of concrete... High grades require smaller lap length... Generally in columns as u go up... Diameter of bar reduces... Load is transferred from above to below... So lap length is as per smaller bar which is transferring load... For m30 grade we r taking it as 40 d only... And obviously it will be same grade at lap because laps comes in area between the floors... Grade cannot vary at lap splice

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to preaper for interview wat they asked in interview give me idea

2181


Concrete cover for slab, column, beam and footing?

648


What is passive earth pressure ?

728


for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)

1791


How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????

1545






How do you change a dimension value in solidsworks?

781


Why is the statue of liberty made of copper?

657


Explain different types of rcc pipes.

711


Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)

2010


What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.

2143


Define mirror?

805


can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.

1235


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

1717


What is the difference between tor steel and tmt steel?

660


How many % we consider for lap for reinforcement for estimates

1372