Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How we check vector group for a Dyn1 transformer?

Answer Posted / vinod maurya

We will short 1U & 2U
And we will apply 3 phase voltage between 1U,1V,1W

Measure between
1U-1V
1V-1W
1W-1U
1V-2v
1V-2w
1W-2w
1W-2v
1W-2n
2n-1U

Verify The Condition
1W-2n+2n-1U= 1U-1W
1W-2w=1W-2v
1V-2v<1V-2w

vector group Dyn1 confirmed if the above conditions are
satisfied.

Is This Answer Correct ?    8 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is capacitor voltage transformer?? how it is different from potential transformer?

2197


During Testing of Maintenance Free Earthing, How deep should be the Spikes of Earth Test Meter should be inserted in the soil(one spike is 15 Meter & Other spike is 30 Mtrs away from the Main Earth Electrode. Because, recently, we observed that when spike is inserted 3-4 Inch in the earth- results are better, If spike is inserted 1 feet deep than results are increasing.

1959


is it possible to test of bus bar in high rise building without completed full floor ?

1709


in basic 2 phase will short means tripping the power but spot welding 2 phase shorting but not tripping it will welded why.....(Q)

1968


How to test the vector group of a Yd11 transformer? what are the relations to be checked between various vectors to confirm this vector group?

4488


At the starting of dc motor and syn.motor and induction motor high current flowing through the winding. Due to this the windings burnt out. To avoid this different types of starters are used. But incase of transformer what Will be used (At starting no emf is induced in the primary winding)?

2045


what is the Connected Load (kW) or Contract Demand (kVA)of mahindra nasik plant??

9499


How many energy meters can be connected on a 15VA Voltage transformer. please send a calculation sheet.

1957


What is ignition module of a CAT Gas Genset G-3508 Engine, Alternator SR4B Series. HOw its checked for correct functioning.Is it repiarable or replacable?

1909


What is the effect on 3phase induction motor if current setting knob of DOL kept at minimum current?

3752


why can the rotor of 3 phase slip ring induction motor not be a 2 phase rotor?

2072


How to calculate the input cable rating for 10kva ups (3phase input and single phase output and also 3phase output, battery rating 65Ah)provide the formula also.thnx

2228


what is meant by tranformer impedance?

2612


one split ac how can told of this ac which Tr tell me us

2039


If a high resistance fault occurs,then what are the changes will happen in the system?

1479