why construction joint in
the slab should be l/3 of
span? what's the technical
reason for that?
Answer Posted / deepak katyal
Construction joints have been provided at 1/3 point of span
on the basis that moment is least there.
| Is This Answer Correct ? | 20 Yes | 2 No |
Post New Answer View All Answers
how to calculate MR 9(derivation)
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
What is horizon or horizontal mining?
Explain moment of inertia and its importance.
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
Define Who designed the city of Washington DC?
how u design STAGING for Superstructure in BRIDGE construction?
how much quantity of cement,sand and water required for 1 sq feet flooring work .
how to calculate the steel in 500yard
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
What is difference between engineering stress and true stress?
In cement concrete how to check a quality of material also proportion of material at site ?
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
How do you prepare Material Recovery Statement for deduction from contractors bills?
What is geopolymer based concrete?