why construction joint in
the slab should be l/3 of
span? what's the technical
reason for that?
Answer Posted / deepak katyal
Construction joints have been provided at 1/3 point of span
on the basis that moment is least there.
Is This Answer Correct ? | 20 Yes | 2 No |
Post New Answer View All Answers
How do we determine the specific gravity of a cement?
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
how to identify np3 pipe and np4 pipe
what are the challenges of being a team leader and a supervisor?
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
what is cross hair cursor?
Please design 12.5m long dubbly beam
How many bricks are there in 100cft?
How do we test on design and style in a software?
how to calculate the strength of rebound hammer test reading in building construction ?
what discoveries did you have in relation to your course?
When was the first motorway built in england?
Define What is the distance between railway tracks?
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???