why construction joint in
the slab should be l/3 of
span? what's the technical
reason for that?

Answer Posted / deepak katyal

Construction joints have been provided at 1/3 point of span
on the basis that moment is least there.

Is This Answer Correct ?    20 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How do we determine the specific gravity of a cement?

655


Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?

1398


how to identify np3 pipe and np4 pipe

1533


what are the challenges of being a team leader and a supervisor?

3344


Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?

2040






what is cross hair cursor?

647


Please design 12.5m long dubbly beam

1478


How many bricks are there in 100cft?

844


How do we test on design and style in a software?

681


how to calculate the strength of rebound hammer test reading in building construction ?

2884


what discoveries did you have in relation to your course?

1660


When was the first motorway built in england?

652


Define What is the distance between railway tracks?

683


How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?

4502


can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???

1447