How to calculate the amount of Brick,cement & sand required
for 1 cum of 230mm thick brick work with ratio 1:5 please
give me an answer with detailed step

Answer Posted / neelesh chouhan

Bricks = 500 no.
cement = 1.762 beg
sand = 1.836 cum

Is This Answer Correct ?    6 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how many cement used in single story residential building per sqft

1295


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

2623


Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?

1479


What is OSHA compliance?

697


What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster

1854






what is cross hair cursor?

653


What is the outturn of Ceiling plastering

2865


how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail

3509


wat would be the probable interview questions and GD topics for IOCL exam?

9242


What is the cemnent ratio

1832


what post do you prefer to work in this company and why do you think you can serve better in such position?

2250


A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals

1782


What are the different types of runners?

690


What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.

1685


how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?

1614