Answer Posted / josh
In SAP SCM APO server, all the data is stored in two ways. The first one is in BW as Info Cubes and second data is stored in Live Cache. The data stored in Live Cache is used for planning and processing during transactions. Cubes are only for storing data and backing up data. The whole reason for making APO as a different server (box) is to make the process of simulation faster using Live Cache memory database which is faster than accessing the data stored in tables in other ECC module.
Hope that will help to answer your question.
Thanks.
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
what is the difference b/w heuristic and optimizer in apo snp?
How would you do the 'creating proportional factors'.
What is release profile?
What is the behaviour of procurement type x?
Explain ppds fixing horizon
when you connect to DBM manager so which database is connect?
Can forecast be moved from Info cube to planning book.
What is the usage of period factor?
How would you do the 'setting up two grids in the planning book'.
Explain snp stock transfer horizon.
How does the data exchange between two systems take place?
Which are the components of the new mysap scm solution?
purchasing and payables done at what level? means operating unit level or SOB level?
How will you do the 'execute an unauthorised transaction'
Differentiate between model and version