BBS = Bar Bending Schedule

uses:
1)provides details of Different Diameter of Steel.
2)Provide the Cutting Length
3)Details of Bar shape
4)Total LEngth
5)Weight of Bar
6)Total Qty of Steel used
7) BBS is used for Billing work

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which are the Steel tests ?

741


Draw a neat sketch showing the 'throat' of a welding in a plate girder ?

1869


16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.

17757


How cracks in concrete can be avoided?

646


How to calculate the force on a column of three story building. What should be the base concrete height?.

1655






What is the difference between chamfer and fillet?

796


Which type of plywood & sizes using in construction projects ?

656


what is raft foundation

1143


What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.

1676


what is pile and deam foundation

1813


what is the formula to find the diagonal shape stirrups?

1445


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1679


what is the painting co efficient of slope roof tiles?

1450


how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?

1536


how to calibrate the RM 800

1858